This page was printed from https://www.ifai.com

Project Title: Capital Square Podium

Category: Freestanding Structures, more than 92 square meters (1,000 square feet)

Completion Date: July 17, 2017

Approximate Size: 272

Unit of Measurement: meter squared

Project Location: Level 2 of Residential/Commercial Tower, Corner of Mount Street & Spring Street, Perth Australia 6000

Fabric Name: Soltis FT381

Fabric Producer: Serge Ferrari

Fabric Supplier: Serge Ferrari

Description:

In the heart of Perth’s CBD, the Capital Square podium was part of an overall development of 3 office towers and the Podium building. The project was designed to create a residential & commercial hub in the heart of Perth’s CBD.

The towers are on the corner of Mount Street and Spring Street in Perth, build on the site of the historic Old Emu Brewery. The overall project aimed to achieve 3 separate 5-star Green ratings, with a strong focus on sustainability across design and energy.

The circular shade structures were constructed on the Podium’s rooftop terrace, adding an architectural element alongside other world-class facilities such as a gym, pool and auditorium.

Purpose:

The client requested a series of architectural structures, clustered in the outdoor area of the podium as part of the Woodside Mining employee facilities. The purpose of the structures was to provide a shaded area for the rooftop facility that complimented the upscale design of the building.

Ferrari Soltis FT381 shade cloth was used for the structures in Hammered Metal to match the vision of the client concept of the terrace. The circular shade structures range in diameter from 6m to 9m.

What's unique:

Given that the structures were to be seen from the ground, but also from the 3 towers above, special consideration was given to make sure they looked amazing from all angles. An integrated LED lighting system was installed, which shows off the circular shapes at night from the towers above. The rings therefore are prominent during the day time and at night.

Located on the 3rd level of a suspended slab was the site. The main road running adjacent meant access was extremely tight, and standard access equipment couldn’t be used. This created a difficult and complex installation methodology to find a solution. Overall, the project took 1,010 man hours to complete.

At ground level, a large crane was required to lift and assemble the steelwork from far away with no site lines. All communication was via radio.

Architectural intent reflected ring-shaped structures that created unique shadows in the ambient shaded areas during the day. We created a unique rafter system with plate work and architectural cut outs to achieve the final product. Some of the structure rings are purely architectural and offer no structural support whatsoever.

Results:

The quality of the completed structures was exceptional. The design intent was met, and the client was very pleased with the outcome of the architectural shade structures.

Due to the proximity of the surrounding 3 towers behind the Podium, it was crucial that the structures looked amazing from all angles, not just at ground level.

A special metallic paint coats the architectural steelwork. This paint system created a strong demand for attention to detail from our installation crew to make sure that the delicate touch-up work was completed to the highest standard.

When combined, the LED lighting system integration, circular steelwork, and mesh shade cloth all worked together to achieve the effects desired by the client.

Images:
(click images for a larger view)