Base stabilization at Port of Invergordon, U.K.
A new 365,973-square-foot (34,000-m2) container area was required in the Port of Invergordon, U.K. The area was constructed as an unbound pavement with a crushed gravel surface. Presto GeoSystems GEOWEB geocells presented an excellent solution to minimize the overall cross-section depth through its unique load transfer mechanism while controlling differential settlement in the heavily loaded [...]